Back to Tools
Material Procurement Tool

Interior Material Cost Calculator

Never run short on materials or blow your budget on excess. Calculate exact quantities including wastage buffers for every material in your project.

Material Cost Calculator

Calculate costs including wastage percentages

Total Material Cost

111,343

MaterialQtyUnitRate (₹)Wastage %Net QtyAmount (₹)
%
22.061,600
%
34.532,775
%
8.41,008
%
162.04,536
%
134.411,424
Base Cost99,860
Wastage Buffer+₹11,483
GRAND TOTAL111,343

Why Wastage Estimates Are Critical

Buying too little material causes project delays when you have to re-order mid-project (often at a higher price). Buying too much wastes your client's money and creates storage issues. Accurate wastage calculation is the hallmark of a professional contractor.

Standard Wastage Percentages in India

  • Plywood (18mm): 10-15% — Extra for edge banding and saw cuts
  • Laminates: 15-20% — High wastage due to pattern matching and edge trimming
  • Flooring Tiles (600×600): 10% straight, 18% diagonal layout
  • Wall Tiles (dado): 12-15% for cutting around fixtures
  • Electrical Wires: 8-10% for routing loops and junction boxes

What percentage wastage should I add for tiles?

For straight-lay tile patterns, add 10-12% wastage. For diagonal patterns (45°), always add 15-20% as more cuts are required at edges and corners.

How much plywood is needed for a 3BHK?

A standard 3BHK project with 3 wardrobes, a kitchen, and a TV unit typically uses between 40-60 sheets of 18mm BWP plywood (8×4ft sheets), depending on the design complexity.